Return

Debbie & Al Farner's 40-footer Restoration in Anacortes

The boat was trucked up to Anacortes the end of July (2015). We fixed the dry rot on the starboard side of the house. Took all the windows and moulding off and fixed lots of leaks. Rebuilt the propane locker to hold three 20lb tanks. Made lots of new hatches in the floor to access everything. Installed new hardwood flooring. Rebuilt the head partially. Installed a dingy crane on the flybridge. Getting ready to install some paneling. Redid lots of electrical and plumbing. Ect ect.

side replacement

Starboard cabin side replacement

side support

Starboard cabin side support for replacement



New Flooring and Hatches

New Flooring and Hatches

Dinghy Crane on Flybridge

Dinghy Crane on Flybridge



Finished Product

Finished

Finished

New Flybridge

New Flybridge

Flybridge Detail

Flybridge Detail

New Salon

New Salon

New Head

New Head