Debbie & Al Farner's 40-footer Restoration in Anacortes
The boat was trucked up to Anacortes the end of July (2015).
We fixed the dry rot on the starboard side of the house. Took all the windows and moulding off and
fixed lots of leaks. Rebuilt the propane locker to hold three 20lb tanks. Made lots of new hatches in
the floor to access everything. Installed new hardwood flooring. Rebuilt the head partially.
Installed a dingy crane on the flybridge. Getting ready to install some paneling. Redid lots of
electrical and plumbing. Ect ect.
|