"Outrageous" Restoration Project

Bow View Stern View
Bow - Early in the rebuild project. Photo shows the weathered gelcoat, old railing, mitred-corner windows, the old canvas - all to be replaced. March 2000 Stern view shows the old dinghy, swim-step, and old canvas. March 2000
Floor Work Window Replacement
Early in the re-build. All new tanks are in place: Two aluminum 200 gal. Gasoline tanks located in same locations as former tanks, fore & aft; 100 gal. plastic domestic Water tank 100 gal. aluminum Diesel tank (for the Espar furnace/water heater) Located same bilge as water tank 100 gal. plastic Blackwater tank placed in same location as former tank 30 gal. plastic Graywater tank mounted under stboard side. Abeam of the tanks is underfloor storage and access to each bilge. The floor will be extended to butt up against the hull, which may add to the stiffness of the hull. September 2001 Window replacement.
Floor Freezer BFlybridge Rebuild title=
New floor freezer, 7.3 cu.ft. situated over the forward gas tank. Looking forward is the large storage bilge. Further forward at the top of the photo is the entrance to the Cuddy Cabin. May 2002 Rebuilding the Flybridge
Yellow Primer In Paint Barn
Sterling 2-part Yellow Primer on the bow. There will be two coats of primer, and two coats of the finish paint, sanded and rubbed between each coat. October 2005 Our boat in the Paint Barn. We first had the Hull painted, then for financial reasons, waited to paint the Cabin. November 2008
New Paint New Interior
New Paint portrait, showing new aluminum siderails, radius cornered windows (notice extra window stb side), new side doors, windshield, new flybridge windshield, 2' bowsprit, and radar arch. November 2010 Interior, looking forward through Galley. The port-side bench is aft of the oven will have a backrest that folds up to become an extension of the galley countertop. The overhead shelves were installed to be used for some storage but also as a handrail in turbulent seas. October 2011